Stabilization of the landslide sites #2, #3 and #4 on the E-60 highway section from Zero Osiauri to Chumateleti, Lot1 km0 – km 5+800 View Larger Image By admin|2025-05-01T09:44:42+00:00May 1st, 2025|Projects| Share This Post With Others! FacebookTwitterLinkedInWhatsAppPinterestEmail Related Posts Stabilization measures for the potential landslide slope adjacent to the km 149 of the Tbilisi-Senaki-Leselidze international (E-60) road Gallery Stabilization measures for the potential landslide slope adjacent to the km 149 of the Tbilisi-Senaki-Leselidze international (E-60) road May 1st, 2025 | 0 Comments Detailed Design & Construction for Rehabilitation of Abastumani Green and Blue Corridor Gallery Detailed Design & Construction for Rehabilitation of Abastumani Green and Blue Corridor May 1st, 2025 | 0 Comments Preparation of feasibility study and detailed design for for Construction of Batumi Bypass-Sarpi (Border of Turkey) Section of the International E70 Gallery Preparation of feasibility study and detailed design for for Construction of Batumi Bypass-Sarpi (Border of Turkey) Section of the International E70 May 1st, 2025 | 0 Comments Preparation of feasibility study and detailed design for E-60 highway section From Natakhtari to Rustavi (Tbilisi Bypass) Gallery Preparation of feasibility study and detailed design for E-60 highway section From Natakhtari to Rustavi (Tbilisi Bypass) May 1st, 2025 | 0 Comments