• Stabilization measures for the potential landslide slope adjacent to the km 149 of the Tbilisi-Senaki-Leselidze international (E-60) road

  • Detailed Design & Construction for Rehabilitation of Abastumani Green and Blue Corridor

  • Preparation of feasibility study and detailed design for for Construction of Batumi Bypass-Sarpi (Border of Turkey) Section of the International E70

  • Preparation of feasibility study and detailed design for E-60 highway section From Natakhtari to Rustavi (Tbilisi Bypass)

  • Preparation of feasibility study and detailed design for E-60 highway section From Natakhtari to Rustavi (Tbilisi Bypass)

  • Preparation of Detailed Designs and Bid Documents for Bakurtsikhe-Tsnori 16 km long section

  • PREPARATION OF DETAILED DESIGN FOR 0.5 KM ROAD LOCATED AT CUSTOMS CLEARANCE ZONE AND TEMPORARY ROAD SECTION CONNECTING BATUMI BYPASS INTERCHANGE TO THE EXISTING LOCAL ROAD

  • Preparation of Detailed Designs and Bid Documents for landslide mitigation for the Tbilisi-Gldani-Tianeti Interstate Road sections

  • PREPARATION OF DETAILED DESIGN FOR CONSTRUCTION OF INTERCHANGE, CONNECTING ZEMO OSIAURI-CHUMATELETI LOT 2 KM 5+800 – KM 7+700 SETION OF THE E-60 HIGHWAY TO THE SURAMI TOWN

  • Preparation of Detailed Designs and Bid Documents for rehabilitation of 14 road sections

  • Stabilization of the landslide sites #2, #3 and #4 on the E-60 highway section from Zero Osiauri to Chumateleti, Lot1 km0 – km 5+800

  • Assessment of Road Network, Preparation of Detailed Design, Environmental and Social Management Documents and Bidding Documents for Output and Performance-Based Road Contract (OPRC) in Guria Region

  • Preparation of Detailed Design for Abastumani Bypass road

  • Preparation of detailed design for new construction of Khevi-Ubisa-Shorapani-Argveta (F2, F3, F4 sections) section (E60 highway route), Bidding documents, Environmental Impact Assessment and detailed LARP

  • Preparation of Detailed Design for the Construction of Chumateleti-Khevi Section (F1 Sections, E60 highway route)

  • PRE-FEASIBILITY STUDY AND FEASIBILITY STUDY FOR SAMTREDIA – ZUGDIDI BYPASS ROAD (INCLUDING ACCESS ROAD TO ANAKLIA DEEP SEA PORT)

  • Preparation of Feasibility Study, Preliminary Design, Environmental and Social Impact Assessment, and Bidding Documents for Design-and-Build Contract for Construction of Bakurtsikhe-Tsnori (16km) and Gurjaani (Chumlaki) – Telavi Bypass (30km) Road Sections and Evaluation of Strategic Importance of Zhinvali-Bakurtsikhe-Tsnori Secondary Transport Corridor

  • Preparation of Detailed Designs for rehabilitation of Dzedzileti-Gordi-Nogha road and construction of bridges over Tskhenistskhali and Mechia rivers

  • Detail Design for Rehabilitation of the Dzirula-Kharagauli-Chumateleti State Road

  • Detail Design for the New Bridge Construction at Village Kanobi, km 113 of Mtskheta-Stepantsminda-Larsi International Highway

  • Detail Design for the New Bridge Construction in the town of Mtskheta across the River Mtkvari

  • Preparation of Feasibility Study Report and Resettlement Policy Framework for Construction of Namakhvani-Alpana Section of Kutaisi-Alpana-Mamisoni Motor Road

  • Detail Design for the New Bridge Construction Program(2015) of the Government of Georgia

  • Detail Design for the New Bridge Construction Program(2014) of the Government of Georgia

  • Design variation for Bypass Section at Agara village of E-60 Highway, PK155-PK190

  • Route analysis and detail design for realignment of the km16,5 – km 18,86 section in Lot -2 of the Kobuleti Bypass Road

  • Detail Design for the New Bridge Construction across the river Tergi at village Gveleti, km 134 of Mtskheta-Stepantsminda-Larsi International Highway

  • Detail Design for the New Bridge Construction across the river Tergi at village Gveleti, km 134 of Mtskheta-Stepantsminda-Larsi International Highway

  • Detail Assessment for “Design-Build” Rehabilitation of the Sasadilo – Sioni Road.

  • Detailed design of Lot 2 Bypass Road, Third East-West Improvement Project, km 80-km95 section (Sveneti-Ruisi) of E-60 Highway

  • Detailed Engineering for the rehabilitation of streets in towns of Georgia

  • Detailed Design and Technical Supervision for Rehabilitation of Roads, Water supply and Sewage lines for the Sairme Resort Town

  • Detail Engineering design under “Annual Program for Road Network Rehabilitation.”

  • E-60 Highway Improvement Project: Feasibility Study and Detail Design for km 80-km 95, “Sveneti-Ruisi” Section

  • Feasibility Study and Detailed Engineering Design for Rehabilitation of Samtskhe-Javakheti Roads

  • Detailed engineering design for Emergency Rehabilitation of roads, bridges and structures affected by storm flood 2005 in Low land regions of the West Georgia

About Us

The “Designing & Consulting Company BT” Ltd (BT Consult) was founded on March 2, 2005.

Company has achieved the License for Designing-Construction Activities (No 4606) on April 27, 2005.

BT (Better Technologies) is a Georgian consulting company delivering engineering services in Georgia for multi-field infrastructure projects since its foundation in 2005, registered and licensed as a Limited Liability Company. BT Consult Ltd was established based on key engineers, dedicating to the company their qualification, skills, and experience gained through the multi-year expertise. The staff has been complemented with young engineers of excellent academic background and demonstrated knowledge in modern technologies and engineering solutions.

Along with all national boards of the infrastructure related entities of Georgia BT is registered with the following international institutions: World Bank, Asian Development Bank, USAID and Millennium Challenge Corporation.

ჩვენი პარტნიორები