Projects

Preparation of feasibility study and detailed design for for Construction of Batumi Bypass-Sarpi (Border of Turkey) Section of the International E70

By |2025-05-01T09:37:39+00:00May 1st, 2025|Projects|

PREPARATION OF DETAILED DESIGN FOR 0.5 KM ROAD LOCATED AT CUSTOMS CLEARANCE ZONE AND TEMPORARY ROAD SECTION CONNECTING BATUMI BYPASS INTERCHANGE TO THE EXISTING LOCAL ROAD

By |2025-05-01T09:40:55+00:00May 1st, 2025|Projects|

PREPARATION OF DETAILED DESIGN FOR CONSTRUCTION OF INTERCHANGE, CONNECTING ZEMO OSIAURI-CHUMATELETI LOT 2 KM 5+800 – KM 7+700 SETION OF THE E-60 HIGHWAY TO THE SURAMI TOWN

By |2025-05-01T09:42:11+00:00May 1st, 2025|Projects|

Go to Top