Crazy

About admin

This author has not yet filled in any details.
So far admin has created 72 blog entries.

Preparation of feasibility study and detailed design for for Construction of Batumi Bypass-Sarpi (Border of Turkey) Section of the International E70

By |2025-05-01T09:37:39+00:00May 1st, 2025|Projects|

PREPARATION OF DETAILED DESIGN FOR 0.5 KM ROAD LOCATED AT CUSTOMS CLEARANCE ZONE AND TEMPORARY ROAD SECTION CONNECTING BATUMI BYPASS INTERCHANGE TO THE EXISTING LOCAL ROAD

By |2025-05-01T09:40:55+00:00May 1st, 2025|Projects|

PREPARATION OF DETAILED DESIGN FOR CONSTRUCTION OF INTERCHANGE, CONNECTING ZEMO OSIAURI-CHUMATELETI LOT 2 KM 5+800 – KM 7+700 SETION OF THE E-60 HIGHWAY TO THE SURAMI TOWN

By |2025-05-01T09:42:11+00:00May 1st, 2025|Projects|

Go to Top