Overall Project Task:
Ltd as an associate of Kocks Consult, was responsible for providing the detailed design and construction specifications for the 3 km road, including the 160-meter-long viaduct bridge across the Liakhvi River
The objective was to divert the international traffic bypassing the viaduct bridge construction site under Lot 2, the TEWHIP project. The road serves for local connectivity after the construction of the section of the main highway.
Detailed Description of Actual Services Provided by BT Ltd:
Topographical survey and geotechnical study of road corridor; Static analysis and structural design of the bridge and road structure; Plotting and production of construction drawings; Environment Impact Assessment and elaboration of Environment Management Plan;