Detailed Design and Technical Supervision for Rehabilitation of Roads, Water supply and Sewage lines for the Sairme Resort Town

Overall Project Task:
Kocks GmbH in association With BT Ltd and “Water & Construction Engineering” LTD (Georgia) was responsible for undertaking design and supervision over the rehabilitation/reconstruction works of infrastructure – roads, water and sewer central systems, Installations of a new Water Treatment Plant (WTP) and Sewage Treatment Plant (STP) in Sairme Resort settlement
Detailed Description of Actual Services Provided by BT Ltd:
• Detailed designs for road, water and waste water infrastructure;
• Construction supervision.