პროექტები

Detailed engineering design for Emergency Rehabilitation of roads, bridges and structures affected by storm flood 2005 in Low land regions of the West Georgia

By |2025-04-15T09:11:59+00:00April 14th, 2025|პროექტები|

Detailed engineering design for Emergency Rehabilitation of roads, bridges and structures affected by storm flood 2005 in Low land regions of the West Georgia Overall Project Task: In 2005 due to the flood in western Georgia, several roads, bridges and road structures were affected. The government elaborated a special “Emergency Response Program”

Feasibility Study and Detailed Engineering Design for Rehabilitation of Samtskhe-Javakheti Roads

By |2025-04-15T09:11:13+00:00April 14th, 2025|პროექტები|

Feasibility Study and Detailed Engineering Design for Rehabilitation of Samtskhe-Javakheti Roads Overall Project Task: In forth of the respective agreement with Millennium Challenge Georgia (MCG) Fund, Kocks Consult GmbH association with BT Ltd was responsible for providing feasibility study, detailed engineering design and tender documents for 285 km length of the road

E-60 Highway Improvement Project: Feasibility Study and Detail Design for km 80-km 95, “Sveneti-Ruisi” Section

By |2025-04-15T06:05:04+00:00April 14th, 2025|პროექტები|

ტექნიკურ-ეკონომიკური დასაბუთების და დეტალური საპროექტო დოკუმენტაციის მოზმადება E-60 მაგისტრალის მონაკვეთი ნატახტარიდან რუსთავამდე - თბილისის შემოვლითი გზისთვის Overall Project Task: E-60 international highway crosses the territory of Georgia from east to the West. The existing two-lane road had to be upgraded to meet a demand of drastically increased traffic flow. Starting from Tbilisi

Detail Engineering design under “Annual Program for Road Network Rehabilitation.”

By |2025-04-15T06:03:36+00:00April 14th, 2025|პროექტები|

Detail Engineering design under “Annual Program for Road Network Rehabilitation.” Overall Project Task: On behalf of the Government of Georgia (GoG), each year Road Department of Georgia releases the tender on design services for road network rehabilitation addressing the rehabilitation needs outlined in the respective program prepared by the transport authorities for

Detailed Design and Technical Supervision for Rehabilitation of Roads, Water supply and Sewage lines for the Sairme Resort Town

By |2025-04-15T06:02:48+00:00April 14th, 2025|პროექტები|

Detailed Design and Technical Supervision for Rehabilitation of Roads, Water supply and Sewage lines for the Sairme Resort Town Overall Project Task: Kocks GmbH in association With BT Ltd and "Water & Construction Engineering" LTD (Georgia) was responsible for undertaking design and supervision over the rehabilitation/reconstruction works of infrastructure - roads, water

Detailed Engineering for the rehabilitation of streets in towns of Georgia

By |2025-04-15T06:01:33+00:00April 14th, 2025|პროექტები|

Detailed Engineering for the rehabilitation of streets in towns of Georgia Overall Project Task: The consultants were responsible for: (i) Traffic counts and data processing in HDM-4 software; (ii) geotechnical investigations, laboratory results; (iii) Topographical Survey; (iv) existing structures inventory; (v) technical specifications and design documentation of the projects. Assignments were given

Detailed design of Lot 2 Bypass Road, Third East-West Improvement Project, km 80-km95 section (Sveneti-Ruisi) of E-60 Highway

By |2025-04-15T06:00:37+00:00April 14th, 2025|პროექტები|

Detailed design of Lot 2 Bypass Road, Third East-West Improvement Project, km 80-km95 section (Sveneti-Ruisi) of E-60 Highway Overall Project Task: Ltd as an associate of Kocks Consult, was responsible for providing the detailed design and construction specifications for the 3 km road, including the 160-meter-long viaduct bridge across the Liakhvi River

სასადილო სიონის საავტომობილო გზის კმ 0 – კმ 17.465 მონაკვეთის რეაბილიტაციის დეტალური პროექტის მომზადება

By |2025-04-15T05:55:09+00:00April 14th, 2025|პროექტები|

სასადილო სიონის საავტომობილო გზის კმ 0 - კმ 17.465 მონაკვეთის რეაბილიტაციის დეტალური პროექტის მომზადება Overall Project Task: The consultant was responsible for (i) carry out a feasibility study to rehabilitate the approximately 17 km road section from village Sasadilo to village Orkhevi and to (ii) deliver relevant Bidding Documents for the improvement

აჭარის შემოვლითი გზების პროექტი: დეტალური საპროექტო დოკუმენტაციის, გარემოზე ზემოქმედების შეფასების, განსახლების სამოქმედო გეგმის და სატენდერო დოკუმენტაციისმომზადება

By |2025-04-15T05:54:17+00:00April 14th, 2025|პროექტები|

აჭარის შემოვლითი გზების პროექტი: დეტალური საპროექტო დოკუმენტაციის, გარემოზე ზემოქმედების შეფასების, განსახლების სამოქმედო გეგმის და სატენდერო დოკუმენტაციისმომზადება Overall Project Task: SAMBO Engineering Inc. was responsible for delivering detailed design, bidding documents, EIA, and LARP for 35 km long road, bypassing Kobuleti and Batumi resort cities. BT had been a subcontractor under the frame

მცხეთა-სტეფანწმინდა-ლარსის (რუსეთის ფედერაციის საზღვარი) საავტომობილო გზის კმ 132 სოფელ გველეთთან მდ. თერგზე არსებული დროებითი ხიდის ნაცვლად ახალი სახიდე გადასასვლელის მშენებლობის და გარემოზე ზემოქმედების შეფასების საპროექტო მომსახურება

By |2025-04-15T05:53:25+00:00April 14th, 2025|პროექტები|

მცხეთა-სტეფანწმინდა-ლარსის (რუსეთის ფედერაციის საზღვარი) საავტომობილო გზის კმ 132 სოფელ გველეთთან მდ. თერგზე არსებული დროებითი ხიდის ნაცვლად ახალი სახიდე გადასასვლელის მშენებლობის და გარემოზე ზემოქმედების შეფასების საპროექტო მომსახურება Overall Project Task: BT was responsible for delivering detailed design services for the new bridge construction. The existing bridge had been badly damaged by the prevailing

Go to Top