2015 წლის პროგრამით გათვალისწინებული ახალი ხიდების მშენებლობისთვის დეტალური საპროექტო და სატენდერო დოკუმენტაციის მომზადება

Overall Project Task:
Kocks GmbH was responsible for delivering detailed design services for the new bridge construction program of 2015. The design of 11 new bridges had been anticipated under the program. Due to the magnitude of the scope and challenging schedule, the leading company redistributed the task among the sub-contractor’s local design companies. BT has undertaken designs of five major bridges within the frame of the program:
• Bridge across the river BIDARA – 63 m in length
• Bridge across the river KVIRILA – 170 m in length
• Railway overpass bridge in village ATSKURI – 81 m in length
• Bridge across the river OCHKhOMURI – 170 m in length
Detailed Description of Actual Services Delivered by BT Ltd:
Road alignment study & verification; Geodetic surveys at the design foundation locations; Hydrological studies; Geological and geotechnical investigations; Road Pavement design;
Design of the bridge; Design of slope protection measures