ქ. მცხეთაში მდ. მტკვარზე სახიდე გადასასვლელის მშენებლობისთვის საჭირო საპროექტო-სახარჯთაღრიცხვო დოკუმენტაციის შედგენა

Overall Project Task:
BT was responsible for delivering the detailed design of the new bridge construction, including designing the road sections at the designed bridge approaches and roundabout type of interchange in the historical town of Mtskheta.
Detailed Description of Actual Services Delivered by BT Ltd:
Road alignment study & verification; Geodetic surveys at the design foundation locations,
Hydrological studies; Geological and geotechnical investigations; Road Pavement design; Bridge 3D modeling and rendering; Design of the 84-meter long single-span arch bridge, including designs of slope protection measures

Existing bridge on river Mtkvari to be replaced

Photo rendering view of the design bridge on river Mtkvari