სამტრედია-ზუგდიდის ასაქცევი გზის (ანაკლიის ღრმაწყლოვან ნავსადგურამდე მისასვლელის ჩათვლით) წინასაპროექტო მოკვლევის და ტექნიკურ-ეკონომიკური დასაბუთების მომზადება

Overall Project Task:
Activity 1: Pre-Feasibility Study of Samtredia-Zugdidi Bypass Road (incl. the access road to Anaklia Deep Sea Port): development and identification of feasible road upgrading/re-alignment options, traffic analyses and demand forecast, evaluation of the cost-effectiveness of upgrading, selecting from various alternatives the preferred alignment between Samtredia-Zugdidi and Anaklia.
Activity 2: Feasibility Study of Samtredia-Zugdidi Bypass Road (incl. the access road to Anaklia Deep Sea Port); establishing the feasibility of the project based on the preferred alignment alternative, fixed during the pre-feasibility stage, preparation of preliminary designs, cost estimates, economic analysis, environmental impact assessment.
Detailed Description of Actual Services Delivered by BT Ltd:
Field surveys
Traffic surveys, including O/D Survey
Traffic Forecast and development of traffic distribution matrix
Economic analysis
Environmental Impact Assessment
Preparation of designs and bills of quantities