დეტალური პროექტის მომზადება E-60 ჩქაროსნული მაგისტრალის ზემო ოსიაური-ჩუმათელეთის ლოტი 1 კმ 0+000 – კმ 5+800 მონაკვეთზე მე-2, მე3 და მე4 დამეწყრილი უბნების სტაბილიზაციისთვის

Overall Project Task:
Preparation of detailed designs for large scale landslide area.
Detailed Description of Actual Services Delivered by BT Ltd:
• Construction design of the landslide stabilization measures: rigorous analysis and design calculations (a conventional combination of LE and FE methods), addressing the Engineer’s comments regarding the design; Deliverables – final design engineering report, weekly/monthly reports of the analysis of the reading of the landslide monitoring devices, construction drawings, bill of quantities, materials specifications; civil works implementation timeframe
• Author’s follow up with the construction implementation: regular visits of the experts of the respective design components, continued monitoring of the landslide devices readings, regular visits of the team leader and experts in respective design components, addressing the Engineer’s comments; Deliverables – letters in reply and associated updates of the method statements or clarifications, monthly reports of the landslide monitoring data
• Validation of the Post –Construction Performance: continued monitoring of the landslide devices readings, development of the post-construction monitoring approach; Deliverables – Summary report of the Pre-construction monitoring data, Post-construction Monitoring Program approved, Summary report of the Post-constriction Performance of the stabilization Measures