გურიის რეგიონში საგზაო ქსელის შეფასება, დეტალური საპროექტო დოკუმენტაციის მომზადება 11 საავტომობილო გზისთვის

Overall Project Task:
Activity 2: Preparation of detailed designs for Output and Performance-Based Road Contract (OPRC) in Guria Region
Detailed Description of Actual Services Delivered by BT Ltd:

Road network total length: 68.1 km;
Width: various, two lanes
Pavement: asphalt concrete;
Other: including rehabilitation of bridges and structures, construction of 1 new bridge.

• Road pavement Assessment based on forecasted traffic loads
• Pavement calculations and design
• Structural calculations and design, including drainage systems
• Engineering Design incl. Preparation of Bidding Documents
• Improvement of road safety level
• Preparation of construction cost estimate
• Preparation of LARP for affected landowners
• Preparation of EIA, EMP